Quality Control of the Light Mixers
for the ATLAS Hadronic Tile Calorimeter


The light-mixers for the PMT blocks of the Hadronic Tile Calorimeter are produced and tested in the Optical laboratory of the Faculty of Mathematics and Physics, Charles University in Prague.

The QC is performed in the following steps:

  1. The material was ordered and delivered in one batch in forms of sheets with thickness 20 mm. The quality and properties are identified by the producer Fa. Roehm, GmbH, Kirschenallee, 64293 Darmstadt, Germany.
    Material: PLEXIGLAS® XT 20070 - an extruded acrylic by the chemical name of polymethyl methacrylate (PMMA). PLEXIGLAS® XT 20070 is clear-transparent (92%) and highly UV-absorbing material.
  2. The shape and the dimensions are given in the enclosed drawing.
  3. The dimensions of each light-mixer are checked by digital length gauge Mitutoyo (accuracy 0.01 mm) to be inside the tolerances. 5% of each batch is measured and recorded.
  4. All the surfaces are polished. Quality of the polished surfaces
  5. The quality of the polished surfaces of each produced light-mixer are inspected by means of a magnifying lens (6x) in a dark filed.
  6. Each batch will be delivered in packs of 500 pieces.

Engineer: Jindrich Walter
Physicists: Rupert Leitner, Michal Suk
QC: Petr Tas












Quality Control Protocols

Done 20 x 500 + 1 x 400 = 10400 pieces (all 10400)


Pack 01 : 05.11.1999 , (Excel - 19kB, pdf - 230kB, ps - 559kB, ps.gz - 104kB)
Pack 02 : 17.11.1999 , (Excel - 19kB, pdf - 230kB, ps - 559kB, ps.gz - 104kB)
Pack 03 : 24.11.1999 , (Excel - 19kB, pdf - 230kB, ps - 559kB, ps.gz - 104kB)
Pack 04 : 01.12.1999 , (Excel - 19kB, pdf - 229kB, ps - 558kB, ps.gz - 103kB)
Pack 05 : 24.02.2000 , (Excel - 20kB, pdf - 230kB, ps - 560kB, ps.gz - 104kB)
Pack 06 : 28.03.2000 , (Excel - 20kB, pdf - 231kB, ps - 561kB, ps.gz - 104kB)
Pack 07 : 15.05.2000 , (Excel - 21kB, pdf - 229kB, ps - 558kB, ps.gz - 104kB)
Pack 08 : 28.06.2000 , (Excel - 21kB, pdf - 229kB, ps - 557kB, ps.gz - 103kB)
Pack 09 : 22.08.2000 , (Excel - 21kB, pdf - 229kB, ps - 557kB, ps.gz - 104kB)
Pack 10 : 20.09.2000 , (Excel - 22kB, pdf - 232kB, ps - 553kB, ps.gz - 127kB)

Pack 11 : 07.11.2000 , (Excel - 20kB, pdf - 229kB, ps - 558kB, ps.gz - 104kB)
Pack 12 : 17.11.2000 , (Excel - 20kB, pdf - 229kB, ps - 559kB, ps.gz - 104kB)

Pack 13 : 31.01.2001 , (Excel - 19kB, pdf - 229kB, ps - 559kB, ps.gz - 104kB)
Pack 14 : 28.02.2001 , (Excel - 21kB, pdf - 229kB, ps - 559kB, ps.gz - 104kB)
Pack 15 : 24.04.2001 , (Excel - 21kB, pdf - 229kB, ps - 557kB, ps.gz - 104kB)
Pack 16 : 19.06.2001 , (Excel - 21kB, pdf - 227kB, ps - 523kB, ps.gz - 106kB)

Pack 17 : 25.07.2001 , (Excel - 21kB, pdf - 227kB, ps - 522kB, ps.gz - 106kB)
Pack 18 : 22.08.2001 , (Excel - 21kB, pdf - 226kB, ps - 521kB, ps.gz - 106kB)
Pack 19 : 25.09.2001 , (Excel - 20kB, pdf - 227kB, ps - 522kB, ps.gz - 106kB)
Pack 20 : 14.11.2001 , (Excel - 20kB, pdf - 226kB, ps - 524kB, ps.gz - 101kB)
Pack 21 : 03.12.2001 , (Excel - 19kB, pdf - 226kB, ps - 523kB, ps.gz - 101kB)



The End ...



P.T. - 20.02.2002 ,